Scheduler
Control precisely timed with the Scheduler of zenon
The light version of the Production and Facility Scheduler (PFS) is included in the zenon basic package.
Through a convenient user interface the scheduler offers a clearly structured overview in calendar layout. This makes it possible to:
- define tasks quickly and intuitively, i.e.: Monday 23:00 until Tuesday 05:00 run multiple paddle mixer.
- time-controlled influence on target values for temperature progression: lower temperature each work-day at 19:00 to 18°C.
- execute functions and VBA macros.
- create extensive “special day” procedures: Apart from public holidays there can be facility-specific “special days” like plant vacations, shutdowns, revision day, and more.
- define multiple facilities and maintenance groups
The scheduler is network capable and fully integrated into the redundancy concept. In difference to the Production and Facility Scheduler it also is available under Windows CE just like the time control.





+1 (973) 920-7882








